Carlton Club
Carlton Club dock and seawall work, done right.
Deckmasters Marine has completed dock restoration, boat lift upgrades, seawall reinforcement, and ICW-frontage work within Carlton Club. Projects are submitted through Carlton Club's HOA review and fully permitted.
- License:
- FL Registered General Contractor — Indian River County, Lic. RG291103858
- Insurance:
- USL&H + Jones Act Marine
- Warranty:
- Structural warranty on completion
The water here
The water here — what it means for construction.
Carlton Club is a gated mainland community in Vero Beach with direct Intracoastal Waterway frontage, providing ICW access and navigation to Sebastian Inlet (north) and Fort Pierce Inlet (south). ICW-facing lots carry a 75-foot channel setback requirement for dock extensions into navigable water. The community falls within or adjacent to Vero Beach city limits, with city dock ordinance applying to most lots. Canal system water depths in Carlton Club are shallower than the open ICW channel, informing piling depth and dock elevation requirements.
Completed services
What we have built at Carlton Club.
Each service listed was completed within Carlton Club under HOA-approved design and FDEP permit. Details available on request.
Architectural review
We handle the architectural review submission.
Carlton Club's HOA reviews waterfront construction submissions for consistency with community standards. The review process is relatively straightforward for dock restoration and boat lift work — the committee focuses on materials, footprint, and compatibility with the existing waterfront aesthetic. Deckmasters prepares the submission documents and coordinates with HOA management through the approval cycle. City of Vero Beach dock permits run concurrent with HOA review for most Carlton Club lots.
We have submitted ARB applications within Carlton Club and navigated the approval process on multiple projects since 2005. We know what the committee requires, what format they prefer, and how to answer their structural questions.
Completed projects
Projects at Carlton Club.
Residential Docks completed at Carlton Club. Photography not available at this time.
Sea Walls completed at Carlton Club. Photography not available at this time.
Boat Lifts completed at Carlton Club. Photography not available at this time.
Select projects at Carlton Club are kept private at the homeowner's request. Ask Keith — we have 21 years of work that did not all make this site.
What neighbors say
Peer references available on request.
Written testimonials from Carlton Club homeowners are available on direct request. References are provided privately — we do not publish client names or property details without explicit written permission.
If you are managing on behalf of a principal and need references before the first call, contact Keith directly.
Other communities
Other communities where we work.
Common questions
Questions about working at Carlton Club.
Does Deckmasters Marine work within Carlton Club?
Yes. Deckmasters Marine LLC has completed dock restoration, boat lift upgrades, and seawall work within Carlton Club, Vero Beach. Keith Hennessy coordinates Carlton Club HOA review and City of Vero Beach permitting as part of standard project delivery. FL RG291103858 (Registered General Contractor, Indian River County).
What permits are required for dock work at Carlton Club?
Carlton Club waterfront projects typically require HOA approval, a City of Vero Beach dock permit (for lots within city limits), and FDEP authorization for any in-water work in ICW-adjacent state waters. USACE Nationwide Permit 13 covers piling installation in navigable ICW water. Total permit processing runs 30 to 60 days after HOA approval.
What is the ICW setback that affects dock length at Carlton Club?
ICW channel setback requirements restrict dock extension to within 75 feet of the ICW channel centerline on navigable-water frontage. Canal-system lots within Carlton Club may have different setback calculations depending on water classification. We survey the site and confirm the applicable setback before finalizing dock design — no surprises at the permit submission stage.
How long does a dock or boat lift project take at Carlton Club?
Carlton Club projects typically run 2 to 5 months from contract to completion. HOA review is generally completed in 1 to 3 weeks. City and FDEP permits process at 30 to 60 days. Boat lift upgrades on existing permitted docks can run faster — sometimes 4 to 8 weeks total — when structural conditions are sound and no new pilings are required.
Request a site visit.
Keith walks your waterfront at Carlton Club and gives you a plain-language assessment — no fee, no obligation.
If you are managing this property on behalf of a principal, we can send our full credentials package — FL license, COI, FDEP permit history, and community references — before the first call. FL Registered General Contractor — Indian River County, Lic. RG291103858
Built for the Lagoon.
