Skip to main content

John's Island2023

Shoreline Restoration — John's Island

A 180-linear-foot shoreline restoration at a waterfront residence on John's Island, combining seagrass-protective design, riprap toe armor, and native plantings under FDEP authorization.

DESIGN ✦ ENGINEER ✦ PERMIT ✦ BUILD

At a glance

Project facts.

Year completed
2023
Scale
180 linear feet of shoreline
Primary service
Shoreline Restoration
Community
John's Island

The project

What happened and why it matters.

The Indian River Lagoon shoreline at John's Island is among the most ecologically sensitive stretches of barrier-island waterfront in Indian River County. When a waterfront estate at John's Island retained Deckmasters Marine to address ongoing erosion and degraded shoreline structure, the project required a design that held the land without compromising the seagrass beds offshore.

The challenge was not merely structural. FDEP Sovereign Submerged Lands authorization and an Environmental Resource Permit General condition governed every element of the design — from the angle of the vinyl seawall toe to the species mix in the native plant buffer. The seagrass clearance requirement is non-negotiable in the Aquatic Preserve, and any toe armor placed in the water had to be set back and configured so as not to shadow or smother existing beds.

Deckmasters designed the restoration in three integrated layers. The vinyl seawall toe provided hard structural reinforcement at the water line, preventing further undercutting during storm surge and tidal cycling. Behind it, riprap toe armor was sized and graded to dissipate wave energy without creating a turbulence zone. Filter cloth geotextile separated the riprap from the substrate, eliminating fine material migration. The uppermost zone was re-established with native salt-tolerant plantings — the biological layer that does the long-term shoreline-holding work no hard structure can replicate alone.

The permit package was coordinated through FDEP's Tallahassee office and the Division of State Lands, a more involved authorization pathway than a standard general permit. Deckmasters prepared the full environmental documentation, including the seagrass survey, the construction methodology, and the post-construction monitoring plan.

When the project closed in late 2023, 180 linear feet of stabilized shoreline replaced what had been an actively eroding edge. The work met FDEP's post-construction inspection standard on the first review.

Technical

Permits and materials.

Permits obtained

  • FDEP Sovereign Submerged Lands Authorization
  • FDEP Environmental Resource Permit — General

Primary materials

  • Vinyl seawall toe
  • Native plantings
  • Riprap toe armor
  • Filter cloth geotextile

Additional services on this project

Work in this category

Request a site visit.

Keith walks your waterfront and gives you a plain-language assessment — no fee, no obligation. Similar projects to this one on John's Island are a natural reference point for that conversation.

License:
FL Registered General Contractor — Indian River County, Lic. RG291103858
Insurance:
USL&H + Jones Act Marine
Warranty:
Structural warranty on completion

Built for the Lagoon.