Windsor — 2022
Full Seawall Replacement — Windsor
A full 220-linear-foot seawall replacement with batter pile reinforcement at a waterfront estate at Windsor, permitted through FDEP and designed to Windsor's architectural review standards.
DESIGN ✦ ENGINEER ✦ PERMIT ✦ BUILD
The project
What happened and why it matters.
Windsor's HOA architectural review committee is widely regarded as one of the most rigorous in Indian River County. For a full seawall replacement at an estate within Windsor, Deckmasters Marine navigated both the engineering demands of a 220-linear-foot replacement and the documentation standards Windsor's committee requires before any permit application is filed.
The existing seawall had reached end of service life. Cap cracking, batter pile fatigue, and evidence of panel movement indicated the structure was no longer performing as a load-bearing boundary. A repair-in-place approach was evaluated and ruled out: the panel system was too degraded to warrant investment in cap repair or partial tieback replacement. Full replacement was the correct decision, and Deckmasters documented that determination for the Windsor ARB submission.
The replacement system used vinyl panels — a material Windsor's committee has accepted for seawall replacement work based on its performance history in the Indian River Lagoon environment and its compatibility with the community's material palette. Vinyl panels were driven to the specified embedment depth, followed by concrete cap construction matching the original profile dimensions. A batter pile system was installed at the outboard face to resist the hydrostatic and tidal loading the cap and panels carry.
Geotextile filter cloth was placed between the panel system and the backfill substrate to prevent fine material migration through panel joints — a detail that matters over the life of the structure, not just at installation.
The FDEP Environmental Resource Permit and Sovereign Submerged Lands Authorization were coordinated simultaneously with Windsor HOA review. Deckmasters prepared both the engineering documentation for FDEP and the material specification package Windsor's committee required. Construction was completed in 2022 and passed final FDEP and county inspection without revision requests.
Technical
Permits and materials.
Permits obtained
- FDEP Environmental Resource Permit
- FDEP Sovereign Submerged Lands Authorization
Primary materials
- Vinyl seawall panels
- Concrete cap
- Batter pile system
- Geotextile filter cloth
Additional services on this project
Work in this category
More projects
Other completed work.
John's Island — 2023
Shoreline Restoration — John's Island
A 180-linear-foot shoreline restoration at a waterfront residence on John's Island, combining seagrass-protective design, riprap toe armor, and native plantings under FDEP authorization.
Orchid Island — 2024
Residential Dock with Boat Lift — Orchid Island
A new 80-foot residential dock with 16,000 lb cradle boat lift at a waterfront residence on Orchid Island, fully permitted through FDEP, USACE, and Indian River County.
The Moorings — 2023
16,000 lb Boat Lift Installation — The Moorings
A 16,000 lb cradle boat lift installed on an existing slip-side dock at a waterfront residence at The Moorings — Indian River County permitted, no FDEP authorization required for slip-internal work.
Request a site visit.
Keith walks your waterfront and gives you a plain-language assessment — no fee, no obligation. Similar projects to this one on Windsor are a natural reference point for that conversation.
- License:
- FL Registered General Contractor — Indian River County, Lic. RG291103858
- Insurance:
- USL&H + Jones Act Marine
- Warranty:
- Structural warranty on completion
Built for the Lagoon.